Pool & Spa openings

  • Plan to schedule pool openings minimally two weeks before you want to swim. Consists of two to three visits, depending on the quality of water at the opening. Remove winter cover, and store where customer requests. Remove winter plugs. Assemble equipment, start equipment to make sure there are no leaks and everything is working. Shock pool, leave pool off. Return a few days later to “super clean” the pool. Super clean is a procedure where we bring our own equipment and vacuum the pool out to waste to prevent any debris and living organisms from going through the filtration system, which helps in the water quality during the beginning of the season. Turn on equipment and check chemicals and balance water if ready. The third visit will be a few days after the super clean  to clean and balance the pool if needed.

Let’s work together

Fill out the form below to get a free quote!